Showgrounds Bridge

The Showgrounds Bridge replaced an old tired timber bridge at the end of its lifecycle. The old bridge was removed by crane and taken away to be recycled. A new bridge was designed and built by the CopeAg team offsite. New foundations have been constructed to accomodate the much wider 3 metre deck, compared to the existing 1.2 metres.