Gallery

Erection of the Aquarena Water Tower

Sweetwater Bridge Replacement Frankston

Sweetwater Bridge Replacement Frankston

Sweetwater Bridge Replacement Frankston

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Healesville Recreation Reserve boardwalk

Frankston Bridges being assembled in the yard

New bridge sections installed

Crossheads installed at Frankston

Good shot of the Membreys cranes at Playne St

Derrick hard at work levelling the piles

Derrick being lifted with the assistance of Membreys

Derrick being fabricated in our Wantirna factory

Fabrication of ‘derrick’ for Playne St

Playne St Bridge Removal

Pouring a concrete deck on Bridge 3 in Donvale

Formwork prep

Trowelling off for that perfect finish

Formwork for concrete pathways in Mullum Mullum

Pumping special coloured concrete into Mullum Mullum

Core drilling into V-Line bridges in Warnambool

Lewis with the catch of the day on last years fishing trip

Completed jetty rejuvenation at Fiochhi Street

Piles driven into the creek bed at Fiochi Street

Framework installed at Fiochhi Street Frankston Council

After shot of the upgrade in Belgrave for Yarra Ranges

Before shot of path and handrail upgrade

Culvert works for Yarra Ranges Council

Culvert works for Yarra Ranges Council

Culvert formwork McIntyres Lane

Erection of the Aquarena Water Slide Tower

Re-decking of Lillydale Lake Rotunda and sailing area.

Lillydale Lake

Lillydale Lake deck replacement

Pontoon Section Lillydale Lake

Boardwalk sections at Mullum Mullum

Bridge 1 completed at Mullum Mullum

Joist installation at Mullum Mullum

Rock beaching underneath Bridge 1, Donvale

Rock beaching

Rock Beaching Donvale

“Rumble boards’ were added to protect tree roots

Rumble boards protected the native vegetation

Bridge 3 just needs a middle span

Span 1 installed at Bridge 3 Donvale

A perfect join by the fabrication team

Bridge 3 completed

Construction of walkway from Bridge 2 Donvale

Elevated Walkway Bridge

Bondek installed ready for concreting

Concrete deck Bridge 2 leadup

Full stretch on Bridge 1

Concrete path works by CopeAg, Donvale

Little Malop street bridge installation

CopeAg crew working through the night

Ready for liftoff at Little Malop street, Geelong

Safety first at CopeAg

Central Road Bridge Completed

Formwork is down at Central Road, Blackburn

Deck poured on Central Road

Temporary ramp constructed by CopeAg

Temporary ramp for Mobil gas pipeline project

Completed ramp section at Yarrville Mobil terminal

Ramp completed at Yarraville

Lewis hard at work, Geelong

Composite decking installed at Bottanica Park

Deck reaching over the lake

Heritage Bridges for the Frankston City Council

Beach Street Frankston

More like for like bridges

Heritage bridges with suspended sewer

Beach Street Bridge, Frankston

Mullum Mullum stage 3

Decking installed on boardwalk

Mullum Mullum stage 3

Bridge installation Mullum Mullum

Another great achievement by CopeAg

The making of the Reynolds Rd pedestrian bridge

Loading of the 25m span

Locked and loaded, ready for installation

Temporary pedestrian ramp

Decking sheets installed

Construction underway at MC2 Doncaster

Panels delivered and installed

CopeAg team with the completed bus shelter

CopeAg graffiti on the Heads Rd bridge upgrade

Installation of cricket nets, Rieschiecks Reserve

Preparing the base for the upcoming slab

Slab pour in Doncaster East