Mullum Mullum Stage Four

IMG_2481
This stage of the Mullum Mullum Linear Pathway, was completed by CopeAg midway through 2014. It is located between Old Warrandyte Road and Park Road, it created a new link for cyclists and pedestrians to effectively ride from the city to Donvale.

 

 

 

 

 

 

IMG_2729

 

All of the fabrication and earthworks were completed by CopeAg, which includes over 100 meters of retaining walls and pedestrian rails. The bridge itself was constructed onsite, making transportation easy.

 

 

 

 

 

IMG_2488

 

There are 3 ‘stand alone’ boardwalks in this section of the trail, that were constructed using Cypress Pine and CarbonLoc decking, making it a structure that will provide incredible grip through those wet winter months.

 

 

 

 

 

 

IMG_2741

 

This completed boardwalk and bridge section has given the area an excellent asset and provides the nearby residents with easy access to major bike paths.