Mullum Mullum Stage 3

Mullum Mullum

Construction is underway of the Mullum Mullum Trail section between Heads Road and Park Road in Donvale. This section consists of 3 bridges and a 70m elevated walkway section with boardwalks and concrete footpaths as connections.

CopeAg has recently completed the installation of Bridge 3 of the project.

 

 

 

 

Start of the Mullum Mullum Trail

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mullum Mullum Trail – Manningham City Council

Consisting of numerous bridges and boardwalks to make up Stage 3 of the Mullum Mullum Trail Project.

Videos from the Mullum Mullum Trail Bridge Installations:

 

 

 

Video of bridge 1 Mullum Mullum Creek

 

Video of bridge 2 Mullum Mullum Creek time lapse 5x